Description
Design and construct/install resilient and sustainable improvements to streets and the pedestrian realm within the historic Third Ward area. Construction of pavement, reinforced concrete curb and gutter, minimum 5' ADA sidewalks, wheelchair ramps, driveways, public utilities, enhanced street and pedestrian lighting. The Authority has received HUD Funding $ 1,428,771.00.
Team
Section A: Edminster, Hinshaw, Russ & Associates, Inc. (Project Engineers), M2L Associates, Inc. (Landscape Architects) Kuo & Associates, Inc. (Surveyors), Geotest Engineering, Inc. (Geotechnical), Ninyo & Moore (Environmental), Blackline Engineering (Traffic Engineers), RODS (Subsurface Utility Engineers)
Section B: IDS Engineering Group (Project Engineers), M2L Associates, Inc. (Landscape Architects), United Engineers, Inc. (Surveyors), Aviles Engineering Corporation (Geotechnical), Intertek PSI, Inc (Environmental) & MBCO Engineering and Surveying, Inc. (Traffic Control)
Timeline
Estimated Timeline to Begin Construction: TBD
Estimated Timeline to Complete Construction: TBD